Studies
- Compliance with the CRE network code: Short circuit studies, power quality, protection coordination, power factor adjustment, electric arc.
- Compliance with requirements before CENACE by; A) Interconnection of Power Plants; B) Change in Capacity of Existing Plants; C) Change of Connection Point; D) Connection of Load Centers; E) Increase in Contracted Demand.
Engineering
- Engineering development for distributed generation projects with wind, solar and combined cycle parks: including the procedures before CENACE, CRE, CFE.
- Development of engineering projects for the protection against atmospheric discharges based on current regulations: IEC 62305, NFPA 780 and NMX ‑ J ‑ 549-ANCE.
- Energy efficiency studies according to ISO50001.
About us
Company created to meet the needs of the energy sector; a sector that has continued to grow in Mexico and with a future full of challenges.
Sinergia Energética, limits these challenges by using cutting-edge technology in the sector and, above all, with specialist personnel in each of the disciplines.
Sinergia Energética staff have had the opportunity to work for several private companies as well as for public organizations.
Contact us. A specialist will support you with your project.